Q-2, r. 35.3.1 - Regulation respecting afforestation and reforestation projects eligible for the issuance of offset credits on privately-owned land

Full text
79. Every project plan verified in accordance with Title VII in which the verifier has noted errors, omissions or inaccuracies in connection with the characterization of the baseline scenario or the results of the simulation of carbon change in the reference scenario must be corrected by the promoter before the project is filed with the Minister.
M.O. 2022-11-17, s. 79.
In force: 2022-12-29
79. Every project plan verified in accordance with Title VII in which the verifier has noted errors, omissions or inaccuracies in connection with the characterization of the baseline scenario or the results of the simulation of carbon change in the reference scenario must be corrected by the promoter before the project is filed with the Minister.
M.O. 2022-11-17, s. 79.